Jeez that’s a lot of control points….
I can’t for the life of me figure out why a control point would be numbered 70506. Does this guy set all of his control in the 70500-70600 range? Are there at least 506 other control points on this job? Does he not understand that you can create different jobs in the data collector and this is literally the 70506th point he’s ever shot or created in one massive job file? I can’t wrap my head around it.
I can’t for the life of me figure out why a control point would be numbered 70506. Does this guy set all of his control in the 70500-70600 range? Are there at least 506 other control points on this job? Does he not understand that you can create different jobs in the data collector and this is literally the 70506th point he’s ever shot or created in one massive job file? I can’t wrap my head around it.